Appointed by the lead design consultant, our digital team provided BIM modelling and management services for two new metro stations. The scope included clash detection and reporting, chairing coordination meetings, and the delivery of a multidisciplinary federated model.
At project commencement, a detailed clash matrix was developed in collaboration with the client to clearly define tolerances and eliminate false positives. Revizto was then used to undertake clash detection and generate structured clash reports, with our team also leading the ongoing coordination meetings.
In parallel, our engineering and as-built teams—appointed under separate scopes—delivered full station models based on 2D documentation.
BIM Management
BIM Coordination
Clash Detection
For the first phase of a major digital campus, the client needed a fully coordinated and buildable MEP design. The existing model was developed to 60% detailed design at LOD 300.
We provided comprehensive MEP BIM modelling, documentation, and clash detection and resolution support to bring the detailed design from 60% to 100%. Our team updated the LOD 300 model, undertook full clash coordination and resolution, and produced detailed 2D design drawings.
By delivering a fully coordinated BIM model, we ensured the client had a practical, buildable solution ready for the next phase of this complex digital campus development.
MEP Engineering
Clash Detection and Resolution