A fully coordinated architectural Revit BIM model, construction-stage drawing packages, and BIM support were delivered for a specialist sports training centre, including indoor training pitch, supporting facilities for players and staff, as well as residential accommodation to support on-site training programmes.
Architecture
Structural Revit modelling and documentation services were delivered to support the transformation of a major sports stadium including the addition of a new 45,000 m² roof structure. The scope focused on developing coordinated digital models and construction documentation for the halo structure, ensuring accuracy and buildability across this large-span intervention. The resulting models and drawings supported the efficient coordination and construction delivery for the stadium upgrade.
Structural Engineering
Architectural documentation support was provided from the planning stage. The engagement commenced with the delivery of RIBA Stage 3 architectural 2D drawings in MicroStation, before transitioning to Revit for the production of RIBA Stage 4 design and construction documentation.
A flexible resourcing model was adopted, with a core team of five to seven professionals scaled to meet changing project demands. This approach enabled rapid mobilisation, consistent output, and timely delivery as the project progressed through critical design stages.
Architecture
During the construction stage, we provided clash detection and reporting to support multidisciplinary BIM coordination. Using the design consultant’s clash matrix, our team applied Solibri—a leading BIM quality assurance solution—to identify, document, and resolve potential conflicts across all disciplines.
With advanced Solibri expertise, we deliver accurate clash detection and reporting across all disciplines that enhances coordination, reduces rework, and helps keep complex projects on schedule and within budget.
Clash Detection
BIM Coordination
Led by our civil team, this project brought together civil, structural, architectural and MEP disciplines to deliver comprehensive as-built documentation for upgrade works to a wastewater treatment facility.
Working in Revit across all disciplines, with Plant 3D used for MEP services, the team developed accurate as-built drawings and models from hundreds of issued-for-construction 2D drawings, 3D models, redline mark-ups and survey data. Delivered over an approximately 15-month period, the coordinated digital outputs provided a reliable foundation to support planning, coordination and delivery of the facility upgrades.
MEP Engineering
Civil Engineering
Structural Engineering
Architecture
As-Built, Scan/CAD/PDF-to-BIM & Digital Twins
RIBA Stage 3 structural design development was supported for a complex education project comprising a new primary school, high school, sports centre and specialist facilities. Working from architectural drawings and structural scheme sketches, a coordinated structural Revit model was developed alongside the full suite of structural drawings.
Structural Engineering
Appointed to support RIBA Stage 4 design development, the project involved the production of a full set of architectural drawings alongside a fully coordinated ArchiCAD model. Working from tender drawings supplied in PDF format and consultant information, we developed the drawings while supporting design coordination across interior design, visualisation, MEP and structural disciplines.
Throughout the project, we worked directly with the client within a shared BIM cloud environment, enabling efficient collaboration, coordination and model development.
Architecture
We partnered with the project’s building services engineering consultant to deliver MEP Stage 4III documentation for a fast-tracked education project. The scope included 140 drawings produced within a five-week programme.
The project involved two new two-storey teaching and learning buildings. Our experienced engineering team brought strong expertise in MEP modelling and detailing across a wide range of educational spaces, supporting timely and coordinated project delivery.
MEP Engineering
We provided structural engineering Revit modelling and documentation support for a major university development delivering state-of-the-art academic teaching and research facilities. Working as partner to the wider consultant team, we produced coordinated structural 3D models and comprehensive 2D drawing sets. Our structured, model-led approach helped ensure clarity, coordination and buildability across this complex education project.
Structural Engineering
The client required an architectural documentation partner with strong Revit and BIM360 expertise to deliver high-quality drawings within a constrained programme.
Working from supplied RIBA Stage 3 CAD drawings, we developed a LOD 300 architectural Revit model and produced the RIBA Stage 4 fit-out documentation packages within a BIM360 environment.
The project is a mixed-use development with more than 400 residential apartments, alongside commercial and retail spaces.
Architecture
Interiors
Architectural construction documentation was delivered at RIBA Stage 5 for a large mixed-use development comprising three towers above a retail podium. The scheme includes residential apartments across 33- and 29-storey towers, alongside a 23-storey, 190-key four-star hotel.
Leveraging extensive UK project experience, we applied a detailed understanding of local building regulations and codes to efficiently produce compliant, construction-ready documentation.
Architecture
To support cladding remediation on a mid-rise residential apartment building, we developed the architectural Revit model using as-built drawings and additional survey data.
The model was developed through RIBA Stage 3 and Stage 4 to produce the required tender and construction drawings, providing accurate and coordinated documentation to guide the remediation works.
Architecture
Our scope focused on architectural Revit modelling of the shell and core during RIBA Stage 4 for a 262-bed budget hotel.
Working from supplied CAD and PDF elevations, we updated the Revit model and selected drawings to reflect revised floor-to-floor heights. Additional modelling and documentation were delivered for the substation, external stair and ramp, along with a series of bay elevation drawings developed in line with the client’s reference standards.
Architecture
Working from supplied SketchUp models and drawings, Revit models were developed to produce interior design fit-out drawing packages for a series of curated workspaces, including coworking areas, meeting rooms, private offices, and lounge and event spaces.
Interiors
This co-living development comprises apartments, amenity spaces, and commercial units across several mid-rise buildings. Using supplied 2D CAD drawings, we developed an architectural Revit model at LOD 300 and delivered the RIBA Stage 3 and Stage 4 drawings, enabling coordinated design and efficient project delivery.
Architecture
The client needed to fast-track the delivery of a revised planning application submission for a multi-building residential development and required additional resources to update the architectural Revit models and drawings from the previous scheme to the new scheme.
We updated the models to reflect the changes to the building massing and reproduced the drawings for the revised planning submission.
During the collaboration we identified design issues and proposed solutions, rationalised the apartment layouts, and highlighted concerns regarding planning or coordination.
Architecture
We supported the delivery of interior design for a new 194-room luxury hotel, developing architectural Revit models for each room type from existing 2D CAD plans.
For RIBA Stage 4, we produced 218 high-quality drawings incorporating all guest rooms and guest room corridors, allowing the client to focus their team on the restaurant and other public areas.
Interiors
Supporting phase one of a large multi-unit residential development across several buildings, our architectural services focused on RIBA Stage 3 and Stage 4 delivery, including the production of LOD 200 architectural Revit models and their development and optimisation to LOD 350, alongside comprehensive drawing production.
Architecture
To support a revised planning application for a high-rise residential tower the client needed additional resources to allow their own team to concentrate on design matters and stakeholder management.
Engaged during RIBA Stages 3 and 4 we provided architectural Revit modelling and documentation services to help progress the updated scheme and deliver the required drawing packages, ensuring the expanded proposal advanced smoothly through planning resubmission while maintaining design intent.
Architecture
We delivered architectural services to support the redesign of a residential tower to incorporate a second staircase. The work included reconfiguring floor and apartment layouts, adjusting the unit mix, and modifying the façade, alongside the production of drawings for the revised planning application.
The project forms part of a residential-led development and relates to one of three towers, rising to 42 storeys and delivering 333 private and affordable apartments within a total floor area of 38,000 m².
Architecture
We provided architectural Revit modelling and documentation support for a residential-led mixed-use development comprising four buildings ranging from 6 to 14 storeys. The scheme delivers 424 one- to four-bedroom apartments within a total floor area of 42,000 m².
Working from existing 2D CAD files, we developed architectural Revit models to LOD 200 and progressed them to LOD 300, producing approximately 1,200 high-quality drawings to support RIBA Stage 3 and Stage 4 delivery.
Architecture
Architectural Revit models were developed to LOD 200 using existing planning-stage 2D CAD information and then progressed to LOD 300 – 350 to support delivery of RIBA Stage 3 and Stage 4 documentation, including the Gateway 2 submission. In total, we delivered 1,141 high-quality coordinated drawings for the residential-led mixed-use tower development.
Architecture
Working from existing planning-stage 2D CAD information, we built LOD 200 architectural Revit models incorporating the updated design intent. The models were then progressed to LOD 300 – 350, supporting the delivery of comprehensive RIBA Stage 4 documentation totalling 490 drawings.
The project comprises a 50,000 m² mixed-use development across two buildings rising to 33 storeys, delivering residential apartments of mixed typology alongside light industrial space and flexible commercial uses.
Architecture
Architectural services included the creation of LOD 200 Revit models, development of Revit models to LOD 300 – LOD 350 and production of RIBA Stage 3 and Stage 4 (including Gateway 2 submission) documentation comprising a total of 1,658 drawings.
The large residential-led mixed-use development includes a combination of commercial spaces and several hundred apartments across four buildings.
Architecture
Development of architectural Revit models from LOD 200 through to LOD 300 – 350 and production of comprehensive RIBA Stage 3 and Stage 4 documentation, totalling several hundred drawings. We also supported a redesign to incorporate Building Safety Act 2022 requirements.
The project involved several hundred apartments of mixed typology across multiple buildings.
Architecture
The client required an advanced architectural Revit 3D model at RIBA Stage 3 level of detail for works involving alterations to the museum’s entrance. Working within a Revit BIM360 environment, we developed the model from supplied schematic design documents, including PDFs, renders, and the existing ArchiCAD model.
Our team delivered a complete Revit model alongside a full set of design development documentation. We also supported design coordination across VS, interior design, MEP, and structural disciplines throughout the programme.
Architecture
We responded to the project’s start–stop delivery programme by providing a flexible resourcing model that allowed the client to scale support as required. This approach enabled the efficient delivery of multiple structural drawing packages.
The initial package focused on reinforced concrete detailing for pile caps, delivered in AutoCAD and comprising 74 RC drawings. A further four packages followed, delivering approximately 450 general arrangement and reinforced concrete intent drawings produced using a combination of AutoCAD and Revit within a shared server environment. Stadium capacity 62,850, multi-purpose pitch.
Structural Engineering
Architectural documentation support was provided for the detailed design and construction stages of a major teaching hospital redevelopment comprising two 17-storey towers and a 10-storey tower providing an additional 1,248 hospital beds, a specialist treatment facility, and London’s largest paediatric care service.
By using our services, the client’s team could focus on design development challenges, the User Group Review process, and coordination and management of the main contractor and consultants.
Architecture
Collaborating with the structural engineers, we provided Revit modelling and documentation support during RIBA Stage 3 spatial coordination stage for the 360-bed critical treatment hospital and associated infrastructure.
We delivered quality documentation allowing the lead design consultant to focus their staff on design development challenges, the user group review process, and the coordination and management of the contractor and consultants.
Structural Engineering
BIM management services were provided on a time-charge basis to validate a model produced by a surveyor responsible for scanning and modelling multiple buildings within a residential precinct. The scope involved comparing the point cloud data against the surveyor’s model and identifying any misalignments in accordance with our client’s defined tolerances.
A structured clash and issue review was undertaken using the agreed rules and tolerances, with findings clearly annotated within the model. Cintoo was used to enable efficient cloud-based management and collaboration of the point cloud data.

BIM Management
BIM Coordination
Commissioned by a leading design practice, architectural interior design support was provided for a grand penthouse project spanning the top two floors of an existing building. The scheme comprises more than 60 family rooms, designed and detailed to an exceptional standard.
An interior Revit model was developed to LOD 350, with comprehensive documentation delivered for RIBA Stages 3 and 4. During Stage 3, bespoke 3D Revit families were created for all joinery elements (excluding back-of-house areas), based on interior design drawings, sketches and reference imagery. Stage 4 focused on the detailed build-up and coordination of internal finishes, including walls, floors, doors, ceilings, window details and curtain pockets.
Stage 3 was completed within an 8-week programme, followed by 14 weeks to deliver the fully coordinated Stage 4 technical documentation, with a total of 275 drawings supporting a high-quality, construction-ready interior fit-out.
Interiors
Architectural BIM and documentation support was provided from the early stages of this project, beginning with assistance in establishing the architectural Revit model and progressing through RIBA Stages 3 and 4, including planning application and construction documentation.
The development comprises two buildings defined by an organic, curvilinear form, rising to a maximum height of 16 storeys. The scheme delivers 456 residential units, including one-, two- and three-bedroom apartments, duplexes and penthouses, many with private garden spaces. Ground- and first-floor commercial areas provide approximately 1,300 m² of flexible retail and commercial accommodation.
Architecture
Supporting the building services engineering consultant, our team delivered MEP Stage 4III documentation for the re-build of two two-storey teaching and learning buildings.
A dedicated team of MEP engineers and technicians produced 140 detailed drawings within a five-week programme, providing accurate, coordinated documentation to meet project requirements.

MEP Engineering
Collaborating with the steelwork fabricator we provided structural engineering services for a major tennis centre upgrade project. Our scope included connection design and 3D modelling of one new spectator stand, comprising 879 tonnes of structural steelwork, as well as 3D modelling of two spectator stands. We also delivered the 3D modelling for a 1,700-tonne fixed roof structure spanning 77 metres, formed from 10 primary roof trusses manufactured to exceptionally high tolerances.
Structural Engineering
We were commissioned by the steelwork fabricator to deliver detailed 3D steelwork modelling and detailing for an indoor aquatic centre. The facility includes two 50-metre swimming pools and a 25-metre diving pool, with seating for up to 17,500 spectators. Our scope included connection design for the 17,500-seat spectator terrace and the centre’s distinctive long-span roof, supported by a 90-metre roof truss. We also designed the roof truss lifting beam and associated brackets.
Using the coordinated 3D model, we produced steelwork arrangement drawings, fabrication drawings and NC data for automated cutting and drilling, alongside comprehensive clash detection to support efficient construction.
The project was delivered by a flexible team of dedicated, highly experienced structural engineers, providing the specialist capability required for a complex, high-profile venue.
Structural Engineering
As part of the refurbishment of this grade II listed building, our architect client required a detailed Revit model of the existing building.
Using supplied point cloud data and survey CAD drawings, we developed a LOD 300 BIM model capturing the building’s existing architectural and structural conditions.
Scan/CAD-to-BIM
We partnered with two design consultants to help produce the architectural drawings required for design development, planning, and construction documentation stages for the redevelopment of an office building including façade reconstruction.
Using a flexible resourcing model and collaborating closely with the architects’ teams, we produced the trade package of drawings in four months and the construction documentation comprising 580 drawings in 6 months.
Architecture
A team of three delivered a comprehensive package of architectural Revit drawings during RIBA Stage 3 and Stage 4 over nine months, including resolution of key design challenges and compliance issues helping to streamline coordination and reduce potential risks during construction.