An existing two-storey building was being converted into a state-of-the-art data centre, and the client required rapid design and test fits of multiple layout options to support end-user presentations. Using a multidisciplinary approach, we delivered an integrated design service, including BIM model creation and comprehensive MEP design support.
By leveraging time zone differences with the client’s team, we enabled seamless collaboration and near 24-hour production of presentation-ready design drawings, supporting an accelerated programme.
Architecture