For the first phase of a major digital campus, the client needed a fully coordinated and buildable MEP design. The existing model was developed to 60% detailed design at LOD 300.
We provided comprehensive MEP BIM modelling, documentation, and clash detection and resolution support to bring the detailed design from 60% to 100%. Our team updated the LOD 300 model, undertook full clash coordination and resolution, and produced detailed 2D design drawings.
By delivering a fully coordinated BIM model, we ensured the client had a practical, buildable solution ready for the next phase of this complex digital campus development.
MEP Engineering
Clash Detection and Resolution