Working collaboratively with two design and façade consultants, a flexible architectural team was deployed to deliver Revit-based tender documentation and issue-for-construction drawings for both the base build and internal layouts. The scope also included the efficient delivery of drawings to support prefabricated bathroom pods.
The project comprises a 39-storey tower accommodating two distinct hotel brands, requiring a coordinated and efficient documentation approach to support construction.
Architecture