Appointed by the lead design consultant, our digital team provided BIM modelling and management services for two new metro stations. The scope included clash detection and reporting, chairing coordination meetings, and the delivery of a multidisciplinary federated model.
At project commencement, a detailed clash matrix was developed in collaboration with the client to clearly define tolerances and eliminate false positives. Revizto was then used to undertake clash detection and generate structured clash reports, with our team also leading the ongoing coordination meetings.
In parallel, our engineering and as-built teams—appointed under separate scopes—delivered full station models based on 2D documentation.
BIM Management
BIM Coordination
Clash Detection